Auf Trustpilot mit „Ausgezeichnet“ bewertet ★★★★★

Verwenden Sie den Code SALE20 für 20 % Rabatt

Kostenloser Versand für alle Bestellungen

Versand in 2-3 Tagen

Rufen Sie uns an 0800 0541 853

    Artikel wurde hinzugefügt

    Subscribe Pfeil nach oben

    Vesgantti Folding Mattress Small Double, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified

    £178.30
    Stückpreis  pro 
  • 【Multifunctional Design】Vesgantti folding mattress is the ideal solution for temporary sleeping accommodation. When not used for sleep, it can be folded into a sofa position, which is very suitable for reading or playing games. Whether it is for guests staying, camping, traveling, yoga, and video gaming, Vesgantti foldable mattress is your ideal choice
  • 【Portable & Easy to Store】The mattress can be folded into a compact shape in seconds for space-saving when not in use. It has two handles for you to carry, making it easier to move and use
  • 【Superior Support & Comfort】Made of premium CertiPUR-US Certified foam, this mattress features a 2-Layer design that includes 3cm gel-infused memory foam and 7cm high-density base foam. The gel memory foam can effectively relieve your body pressure, and give you a cooling and cloud-like sleep experience; The high density support foam gives your body perfect support from head to toe
  • 【Breathable & Washable Cover】The breathable cover is made of skin-friendly knitted fabric, which can absorb sweat and dry quickly, keeping cool after you sleep for a long time. The non-slip cloth at the bottom can prevent sliding during use. Coming with the smooth zipper, the cover of our tri-fold mattress can be quickly removed for easy washing
  • 【Instructions & Service】Vesgantti folding mattress is compressed rolled, and you can easily move it and set it up in your room. It will inflate right after unpacking but please allow 24-48 hours for it to fully expand (Memory foam will expand faster in a warmer room. In cold temperatures, your mattress may take a bit longer to return to full size). If you are not satisfied for any reason, please do not hesitate to let us know
  • Vesgantti Folding Mattress Small Double, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified
    Vesgantti Folding Mattress Small Double, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified
    local_offer

    Für Sie empfohlen

    Zuletzt angesehen