Rated Excellent On Trustpilot ★★★★★

Use Code SALE20 for 20% Off

Free shipping On All Orders

Shipping In 2-3 Days

    Item has been added

    Subscribe arrow_drop_up

    Vesgantti Folding Mattress Single Size 90x190cm, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - Grey, CertiPUR-US Certified

    £1,500.00
    Unit price  per 
  • 【Vesgantti Folding Mattress】This tri-fold mattress features a space-saving design. It can be easily folded into three sections with extra handle, making it convenient for storage and transportation. Whether you need an extra bed for guests, a comfortable sleeping option for camping, or a mattress for small living space, this mattress is the perfect solution. It can be effortlessly stored in a closet or carried in the trunk of your car, providing you with flexibility and convenience
  • 【Premium Comfort and Support】Crafted with high-quality materials, this folding mattress offers exceptional comfort and support. The dual-layer construction includes a 3cm soft and cool memory foam layer that conforms to your body, providing a cozy sleeping surface. Beneath that, a 7cm supportive core helps to evenly distribute your body weight, relieving pressure points and ensuring a restful sleep
  • 【Soft and Comfortable】 The unique texture of the fabric offers exceptional comfort. It is supple enough to conform to the body's contours, providing a cozy and supportive surface. The bottom fabric of the mattress features an anti-slip design. This effectively prevents the mattress from shifting or sliding during use, providing a stable and secure sleeping surface. The fabric of this folding mattress is free from harmful chemicals, making it gentle on the skin
  • 【Easy to Clean and Maintain】 We understand the importance of easy cleaning, especially for a mattress. This tri-fold mattress is designed with a removable and washable cover, allowing you to keep it clean and fresh with minimal effort. Simply unzip the cover and toss it in the washing machine whenever it gets dirty. The mattress itself is also easy to wipe clean, ensuring that it free from stains and odors
  • 【Versatile Application】 This mattress is not limited to just one use. It is incredibly versatile and can be used in a variety of settings. In addition to being a great guest bed, it can be used as a floor mattress for kids' playrooms or as a temporary bed during home renovations. It's also a popular choice for outdoor activities like camping or picnicking. Its adaptability makes it a valuable addition to any household or travel gear collection
  • Vesgantti Folding Mattress Single Size 90x190cm, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - Grey, CertiPUR-US Certified
    Vesgantti Folding Mattress Single Size 90x190cm, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - Grey, CertiPUR-US Certified
    local_offer

    Recommended for you

    Recently viewed